| Assessment Year | 2003 |
|---|---|
| Principal Product | Molded Urethane Products |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 87 |
| Plant Area |
30,000
ft2
|
| Annual Production | 750,000
pieces
|
| Production Hrs. Annual | 2,117
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $49,915 | 673,855 |
kWh
|
$0.074 |
| Electricity Demand | $3,866 | 2,983 |
kW-mo/yr
|
$1.30 |
| Electricity Fees | $15,233 | - |
|
- |
| Natural Gas | $7,685 | 1,016 |
MMBtu
|
$7.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $45,978 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7145: Install skylights | $1,977 | $4,374 |
$1,977
25,715
kWh
|
- | - | - | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $402 | $1,000 |
$396
5,152
kWh
|
$6
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,619 | $120 |
$3,498
45,489
kWh
|
$121
-
kW-mo/yr
|
- | - | |
| 04 | 2.7234: Use heat pump for space conditioning | $4,075 | $700 |
$4,041
52,560
kWh
|
$34
-
kW-mo/yr
|
- | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $194 | - |
$189
2,465
kWh
|
$5
-
kW-mo/yr
|
- | - | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $29,631 | $1,380 | - | - | - | $29,631 | |
| 07 | 4.521: Clear and rent existing space | $12,132 | $9,260 | - | - | $12,132 | - | |
| TOTAL RECOMMENDED | $52,030 | $16,834 |
$10,101
131,381
kWh
|
$166
-
kW-mo/yr
|
$12,132 | $29,631 | ||
| TOTAL IMPLEMENTED | $45,978 | $11,760 |
$4,083
53,106
kWh
|
$132
-
kW-mo/yr
|
$12,132 | $29,631 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs