Assessment Year | 2006 |
---|---|
Principal Product | Industrial chemicals |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
50,000
ft2
|
Annual Production | 44,760,000
lb
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $684,847 | 20,493,765 |
kWh
|
$0.033 |
Electricity Demand | $487,540 | 32,979 |
kW-mo/yr
|
$14.78 |
Electricity Fees | $6,000 | - |
|
- |
Fuel Oil #6 | $289,410 | 44,506 |
MMBtu
|
$6.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $573,164 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $98,735 | $59,350 | - | - |
$98,735
-
MMBtu
|
- | - | |
02 | 2.2615: Clean condenser tubes | $123,800 | $5,000 |
$(-2,356.0)
(-3,600)
kWh
|
- |
$(-2,327.0)
-
MMBtu
|
$(-60,648.0) | $189,131 | |
03 | 4.113: Install refrigeration system to cool product | $315,779 | $167,000 | - |
$(-57,827.0)
-
kW-mo/yr
|
$(-4,656.0)
-
MMBtu
|
- | $378,262 | |
04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $23,395 | $10,000 | - | - |
$23,395
-
MMBtu
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $8,998 | $7,650 | - | - |
$8,998
-
MMBtu
|
- | - | |
06 | 2.2122: Install / repair insulation on condensate lines | $2,457 | $2,420 | - | - |
$2,457
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $573,164 | $251,420 |
$(-2,356.0)
(-3,600)
kWh
|
$(-57,827.0)
-
kW-mo/yr
|
$126,602
-
MMBtu
|
$(-60,648.0) | $567,393 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs