ITAC Assessment: AS0351
ITAC logo
ITAC Assessment: AS0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pre-cast concrete manholes and water vaults
NAICS 327332: Concrete Pipe Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 435,600
ft2
Annual Production 14,000
bushels
Production Hrs. Annual 4,445
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,550 238,776
kWh
Electricity Demand $1,312 1,066
kW-mo/yr
Electricity Fees $5,239 -
Other Energy $35,701 11,090
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,368

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Increase in Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $110 $15 $110
1,469
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,729 $60 $7,602
101,424
kWh
$127
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $462 $1,000 $457
6,096
kWh
$5
-
kW-mo/yr
- -
04 2.1331: Burn a less expensive grade of fuel $26,419 $6,500 - - $26,419
-
MMBtu
-
05 4.514: Re-arrange equipment layout to reduce handling costs $10,220 $805 - - - $10,220
TOTAL RECOMMENDED $44,940 $8,380 $8,169
108,989
kWh
$132
-
kW-mo/yr
$26,419
-
MMBtu
$10,220
TOTAL IMPLEMENTED $44,368 $7,365 $7,602
101,424
kWh
$127
-
kW-mo/yr
$26,419
-
MMBtu
$10,220
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs