| Assessment Year | 2003 |
|---|---|
| Principal Product | Pre-cast concrete manholes and water vaults |
| NAICS | 327332: Concrete Pipe Manufacturing |
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $1 M to 5M |
| # of Employees | 55 |
| Plant Area |
435,600
ft2
|
| Annual Production | 14,000
bushels
|
| Production Hrs. Annual | 4,445
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $17,550 | 238,776 |
kWh
|
$0.073 |
| Electricity Demand | $1,312 | 1,066 |
kW-mo/yr
|
$1.23 |
| Electricity Fees | $5,239 | - |
|
- |
| Other Energy | $35,701 | 11,090 |
MMBtu
|
$3.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,368 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $110 | $15 |
$110
1,469
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,729 | $60 |
$7,602
101,424
kWh
|
$127
-
kW-mo/yr
|
- | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $462 | $1,000 |
$457
6,096
kWh
|
$5
-
kW-mo/yr
|
- | - | |
| 04 | 2.1331: Burn a less expensive grade of fuel | $26,419 | $6,500 | - | - |
$26,419
-
MMBtu
|
- | |
| 05 | 4.514: Re-arrange equipment layout to reduce handling costs | $10,220 | $805 | - | - | - | $10,220 | |
| TOTAL RECOMMENDED | $44,940 | $8,380 |
$8,169
108,989
kWh
|
$132
-
kW-mo/yr
|
$26,419
-
MMBtu
|
$10,220 | ||
| TOTAL IMPLEMENTED | $44,368 | $7,365 |
$7,602
101,424
kWh
|
$127
-
kW-mo/yr
|
$26,419
-
MMBtu
|
$10,220 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs