Assessment Year | 2003 |
---|---|
Principal Product | Pre-cast concrete manholes and water vaults |
NAICS | 327332: Concrete Pipe Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $1 M to 5M |
# of Employees | 55 |
Plant Area |
435,600
ft2
|
Annual Production | 14,000
bushels
|
Production Hrs. Annual | 4,445
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $17,550 | 238,776 |
kWh
|
$0.073 |
Electricity Demand | $1,312 | 1,066 |
kW-mo/yr
|
$1.23 |
Electricity Fees | $5,239 | - |
|
- |
Other Energy | $35,701 | 11,090 |
MMBtu
|
$3.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,368 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $110 | $15 |
$110
1,469
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,729 | $60 |
$7,602
101,424
kWh
|
$127
-
kW-mo/yr
|
- | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $462 | $1,000 |
$457
6,096
kWh
|
$5
-
kW-mo/yr
|
- | - | |
04 | 2.1331: Burn a less expensive grade of fuel | $26,419 | $6,500 | - | - |
$26,419
-
MMBtu
|
- | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $10,220 | $805 | - | - | - | $10,220 | |
TOTAL RECOMMENDED | $44,940 | $8,380 |
$8,169
108,989
kWh
|
$132
-
kW-mo/yr
|
$26,419
-
MMBtu
|
$10,220 | ||
TOTAL IMPLEMENTED | $44,368 | $7,365 |
$7,602
101,424
kWh
|
$127
-
kW-mo/yr
|
$26,419
-
MMBtu
|
$10,220 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs