ITAC Assessment: AS0350
ITAC logo
ITAC Assessment: AS0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Vitamins and Dietary Supplements
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 95,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,221
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,246 2,399,956
kWh
Electricity Demand $15,226 4,274
kW-mo/yr
Electricity Fees $36,059 -
Natural Gas $7,709 1,032
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.7145: Install skylights $2,149 $8,264 $2,149
32,713
kWh
- - -
02 2.7111: Reduce illumination to minimum necessary levels $2,205 $255 $1,832
26,494
kWh
$373
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,132 $1,575 $1,132
16,368
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,590 $20 $1,386
21,089
kWh
$204
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,725 $2,550 $2,385
36,301
kWh
$340
-
kW-mo/yr
- -
06 3.4111: Use closed cycle process to minimize waste water production $921 $1,300 - - $921
-
Tgal
-
07 4.441: Install automatic packing equipment $40,475 $57,000 - - - $40,475
TOTAL RECOMMENDED $51,197 $70,964 $8,884
132,965
kWh
$917
-
kW-mo/yr
$921
-
Tgal
$40,475
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs