Assessment Year | 2003 |
---|---|
Principal Product | Vitamins and Dietary Supplements |
NAICS | 325411: Medicinal and Botanical Manufacturing |
SIC | 2833: Medicinal Chemicals and Botanical Products |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
95,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,221
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $159,246 | 2,399,956 |
kWh
|
$0.066 |
Electricity Demand | $15,226 | 4,274 |
kW-mo/yr
|
$3.56 |
Electricity Fees | $36,059 | - |
|
- |
Natural Gas | $7,709 | 1,032 |
MMBtu
|
$7.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,197 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7145: Install skylights | $2,149 | $8,264 |
$2,149
32,713
kWh
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,205 | $255 |
$1,832
26,494
kWh
|
$373
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $1,132 | $1,575 |
$1,132
16,368
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,590 | $20 |
$1,386
21,089
kWh
|
$204
-
kW-mo/yr
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,725 | $2,550 |
$2,385
36,301
kWh
|
$340
-
kW-mo/yr
|
- | - | |
06 | 3.4111: Use closed cycle process to minimize waste water production | $921 | $1,300 | - | - |
$921
-
Tgal
|
- | |
07 | 4.441: Install automatic packing equipment | $40,475 | $57,000 | - | - | - | $40,475 | |
TOTAL RECOMMENDED | $51,197 | $70,964 |
$8,884
132,965
kWh
|
$917
-
kW-mo/yr
|
$921
-
Tgal
|
$40,475 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs