ITAC Assessment: AS0348
ITAC logo
ITAC Assessment: AS0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Sheet metal work, electromechanical assembly, turnkey contract manufactu
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 84,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,404
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,258 817,549
kWh
Electricity Demand $16,146 4,009
kW-mo/yr
Electricity Fees $6,902 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $164 $101 $159
3,027
kWh
$5
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,361 $16,680 $1,454
26,394
kWh
$1,907
-
kW-mo/yr
-
03 2.4322: Use or replace with energy efficient substitutes $4,000 $15,500 $3,251
58,898
kWh
$749
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,021 $450 $4,875
90,123
kWh
$2,146
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $413 $2,000 $311
5,743
kWh
$102
-
kW-mo/yr
-
06 4.514: Re-arrange equipment layout to reduce handling costs $93,399 $45,312 - - $93,399
TOTAL RECOMMENDED $108,358 $80,043 $10,050
184,185
kWh
$4,909
-
kW-mo/yr
$93,399
TOTAL IMPLEMENTED $10,959 $19,231 $6,799
125,287
kWh
$4,160
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs