Assessment Year | 2003 |
---|---|
Principal Product | Sheet metal work, electromechanical assembly, turnkey contract manufactu |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 78 |
Plant Area |
84,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,404
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $40,258 | 817,549 |
kWh
|
$0.049 |
Electricity Demand | $16,146 | 4,009 |
kW-mo/yr
|
$4.03 |
Electricity Fees | $6,902 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,959 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $164 | $101 |
$159
3,027
kWh
|
$5
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,361 | $16,680 |
$1,454
26,394
kWh
|
$1,907
-
kW-mo/yr
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $4,000 | $15,500 |
$3,251
58,898
kWh
|
$749
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,021 | $450 |
$4,875
90,123
kWh
|
$2,146
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $413 | $2,000 |
$311
5,743
kWh
|
$102
-
kW-mo/yr
|
- | |
06 | 4.514: Re-arrange equipment layout to reduce handling costs | $93,399 | $45,312 | - | - | $93,399 | |
TOTAL RECOMMENDED | $108,358 | $80,043 |
$10,050
184,185
kWh
|
$4,909
-
kW-mo/yr
|
$93,399 | ||
TOTAL IMPLEMENTED | $10,959 | $19,231 |
$6,799
125,287
kWh
|
$4,160
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs