ITAC Assessment: AS0347
ITAC logo
ITAC Assessment: AS0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Ceramic Microelectronics Packages for Wireless and Digital Applications
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 35,000
ft2
Annual Production 372,000
units
Production Hrs. Annual 2,358
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,228 1,295,520
kWh
Electricity Demand $9,362 3,682
kW-mo/yr
Electricity Fees $6,803 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Increase in Production Savings
01 2.6218: Turn off equipment when not in use $1,462 - $1,102
27,818
kWh
$360
-
kW-mo/yr
- - -
02 2.7232: Replace existing hvac unit with high efficiency model $8,330 $8,920 $5,417
137,094
kWh
$2,913
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,837 $60 $899
22,696
kWh
$938
-
kW-mo/yr
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $10,657 $18,000 $7,689
194,111
kWh
$2,968
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $3,155 $14 $1,543
39,027
kWh
$1,612
-
kW-mo/yr
- - -
06 3.5217: Reuse / recycle/ sell paper products $720 $40 - - $720
-
lb
- -
07 4.514: Re-arrange equipment layout to reduce handling costs $27,104 $6,400 - - - $27,104 -
08 4.111: Add equipment/ operators to reduce production bottleneck $64,137 $800 - - - - $64,137
09 4.521: Clear and rent existing space $15,165 $11,220 n/a - - - $15,165 -
TOTAL RECOMMENDED $132,567 $45,454 $16,650
420,746
kWh
$8,791
-
kW-mo/yr
$720
-
lb
$42,269 $64,137
TOTAL IMPLEMENTED $12,349 $9,020 $7,418
187,608
kWh
$4,211
-
kW-mo/yr
$720
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs