Assessment Year | 2003 |
---|---|
Principal Product | Building and deck materials, paneling and siding |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2435: Hardwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
566,280
ft2
|
Annual Production | 60,000
thousand feet
|
Production Hrs. Annual | 2,159
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,646 | 598,286 |
kWh
|
$0.066 |
Electricity Demand | $8,294 | 3,629 |
kW-mo/yr
|
$2.29 |
Electricity Fees | $5,742 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,379 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,169 | $6,136 |
$765
13,521
kWh
|
$404
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $512 | $5,250 |
$512
9,057
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,587 | $10,835 |
$700
132,702
kWh
|
$2,887
-
kW-mo/yr
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $473 | $21 |
$473
8,360
kWh
|
- | - | |
05 | 2.2622: Replace existing chiller with high efficiency model | $82 | $356 |
$82
1,450
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $68 | $167 |
$43
750
kWh
|
$25
-
kW-mo/yr
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $1,260 | $1,751 | n/a | - | - | $1,260 |
TOTAL RECOMMENDED | $7,151 | $24,516 |
$2,575
165,840
kWh
|
$3,316
-
kW-mo/yr
|
$1,260 | ||
TOTAL IMPLEMENTED | $5,379 | $17,515 |
$2,063
156,783
kWh
|
$3,316
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs