ITAC Assessment: AS0342
ITAC logo
ITAC Assessment: AS0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Deli Sandwiches
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 55,000
ft2
Annual Production 52,000,000
pieces
Production Hrs. Annual 2,921
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,227 3,638,600
kWh
Electricity Demand $14,066 8,484
kW-mo/yr
Electricity Fees $17,038 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $586,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $853

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,753 $8,149 $928
20,129
kWh
$739
-
kW-mo/yr
- - - $86 -
02 2.7135: Install occupancy sensors $500 $750 $500
10,850
kWh
- - - - - -
03 2.4133: Use most efficient type of electric motors $813 $2,376 $477
10,338
kWh
$336
-
kW-mo/yr
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $497 $30 $292
6,325
kWh
$205
-
kW-mo/yr
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,918 $6,084 $2,298
49,851
kWh
$1,620
-
kW-mo/yr
- - - - -
06 2.6212: Turn off equipment during breaks, reduce operating time $853 - $853
18,502
kWh
- - - - - -
07 2.7232: Replace existing hvac unit with high efficiency model $3,367 $3,600 $2,114
45,860
kWh
$1,253
-
kW-mo/yr
- - - - -
08 2.7145: Install skylights $751 $1,958 $751
16,299
kWh
- - - - - -
09 2.4314: Use synthetic lubricant $969 $3,231 $289
4,818
kWh
$131
-
kW-mo/yr
$549
-
gal
- - - -
10 2.7111: Reduce illumination to minimum necessary levels $3,251 $387 $1,682
44,505
kWh
$1,569
-
kW-mo/yr
- - - - -
11 4.441: Install automatic packing equipment $258,120 $14,080 n/a - - - $258,120 - - -
12 4.441: Install automatic packing equipment $37,933 $57,000 n/a - - - $37,933 - - -
13 4.441: Install automatic packing equipment $15,933 $22,000 n/a - - - $15,933 - - -
14 4.125: $88,920 $1,140 - - - - - - $88,920
15 4.521: Clear and rent existing space $168,960 $8,364 - - - - $168,960 - -
TOTAL RECOMMENDED $586,538 $129,149 $10,184
227,477
kWh
$5,853
-
kW-mo/yr
$549
-
gal
$311,986 $168,960 $86 $88,920
TOTAL IMPLEMENTED $853 - $853
18,502
kWh
- - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs