Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Bottled Water
NAICS 312112: Bottled Water Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area 11,000
ft2
Annual Production 3,352,683
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,600 2,338,560
kWh
Electricity Demand $9,010 5,614
kW-mo/yr
Electricity Fees $11,877 -
Natural Gas $25,641 2,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,096 $6,789 $344
7,467
kWh
$1,752
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $834 $891 $411
21,792
kWh
$423
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,327 $40 $655
14,203
kWh
$672
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,287 $260 $9,729
211,680
kWh
$12,558
-
kW-mo/yr
- - -
05 2.6218: Turn off equipment when not in use $193 $442 $193
4,175
kWh
- - - -
06 3.4156: Use flow control valves on equipment to optimize water use $20,939 - - - $20,939
-
Tgal
- -
07 4.611: Begin a practice of predictive / preventative maintenance $23,277 $14,364 - - - - $23,277
08 4.441: Install automatic packing equipment $40,000 $616 - - - $40,000 -
TOTAL RECOMMENDED $110,953 $23,402 $11,332
259,317
kWh
$15,405
-
kW-mo/yr
$20,939
-
Tgal
$40,000 $23,277
TOTAL IMPLEMENTED $23,614 $300 $10,384
225,883
kWh
$13,230
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs