Assessment Year | 2003 |
---|---|
Principal Product | Bottled Water |
NAICS | 312112: Bottled Water Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 94 |
Plant Area |
11,000
ft2
|
Annual Production | 3,352,683
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,600 | 2,338,560 |
kWh
|
$0.061 |
Electricity Demand | $9,010 | 5,614 |
kW-mo/yr
|
$1.60 |
Electricity Fees | $11,877 | - |
|
- |
Natural Gas | $25,641 | 2,830 |
MMBtu
|
$9.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $110,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,614 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,096 | $6,789 |
$344
7,467
kWh
|
$1,752
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $834 | $891 |
$411
21,792
kWh
|
$423
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,327 | $40 |
$655
14,203
kWh
|
$672
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,287 | $260 |
$9,729
211,680
kWh
|
$12,558
-
kW-mo/yr
|
- | - | - | |
05 | 2.6218: Turn off equipment when not in use | $193 | $442 |
$193
4,175
kWh
|
- | - | - | - | |
06 | 3.4156: Use flow control valves on equipment to optimize water use | $20,939 | - | - | - |
$20,939
-
Tgal
|
- | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $23,277 | $14,364 | - | - | - | - | $23,277 | |
08 | 4.441: Install automatic packing equipment | $40,000 | $616 | - | - | - | $40,000 | - | |
TOTAL RECOMMENDED | $110,953 | $23,402 |
$11,332
259,317
kWh
|
$15,405
-
kW-mo/yr
|
$20,939
-
Tgal
|
$40,000 | $23,277 | ||
TOTAL IMPLEMENTED | $23,614 | $300 |
$10,384
225,883
kWh
|
$13,230
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs