Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product High performance cameras and fingerprint analysis machines
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 37,346
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,718
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,890 1,080,160
kWh
Electricity Demand $21,460 2,430
kW-mo/yr
Electricity Fees $8,779 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,846 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $400 $1,425 $400
5,887
kWh
-
02 2.7212: Install or upgrade insulation on hvac distribution systems $501 $200 $427
6,269
kWh
$74
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $17,394 $32,550 $13,798
202,823
kWh
$3,596
-
kW-mo/yr
04 2.6212: Turn off equipment during breaks, reduce operating time $7,813 - $7,813
114,840
kWh
-
05 2.4323: Use optimum size and capacity equipment $5,738 $15,320 $4,710
69,232
kWh
$1,028
-
kW-mo/yr
TOTAL RECOMMENDED $31,846 $49,495 $27,148
399,051
kWh
$4,698
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs