Assessment Year | 2002 |
---|---|
Principal Product | Soft drinks and carbonated waters |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 304 |
Plant Area |
122,000
ft2
|
Annual Production | 18,000,000
pieces
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $337,884 | 5,383,710 |
kWh
|
$0.063 |
Electricity Demand | $88,634 | 12,799 |
kW-mo/yr
|
$6.93 |
Electricity Fees | $41,380 | - |
|
- |
Natural Gas | $141,138 | 16,320 |
MMBtu
|
$8.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $161,174 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $104,672 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $4,752 | $3,880 |
$4,151
61,077
kWh
|
$601
-
kW-mo/yr
|
- | - | - | |
02 | 2.7145: Install skylights | $17,275 | $26,928 |
$17,275
254,192
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,966 | $20 |
$12,198
179,494
kWh
|
$1,768
-
kW-mo/yr
|
- | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $34,077 | $400 |
$29,764
437,970
kWh
|
$4,313
-
kW-mo/yr
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $498 | $542 |
$435
6,400
kWh
|
$63
-
kW-mo/yr
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $371 | $63 | - | - |
$371
-
MMBtu
|
- | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $398 | - |
$258
3,793
kWh
|
$140
-
kW-mo/yr
|
- | - | - | |
08 | 4.611: Begin a practice of predictive / preventative maintenance | $89,018 | $19,710 | - | - | - | $89,018 | - | |
09 | 4.821: Pay bills on time to avoid late fees | $819 | $144 | - | - | - | - | $819 | |
TOTAL RECOMMENDED | $161,174 | $51,687 |
$64,081
942,926
kWh
|
$6,885
-
kW-mo/yr
|
$371
-
MMBtu
|
$89,018 | $819 | ||
TOTAL IMPLEMENTED | $104,672 | $20,479 |
$12,633
185,894
kWh
|
$1,831
-
kW-mo/yr
|
$371
-
MMBtu
|
$89,018 | $819 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs