ITAC Assessment: AS0331
ITAC logo
ITAC Assessment: AS0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Soft drinks and carbonated waters
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 304
Plant Area 122,000
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,884 5,383,710
kWh
Electricity Demand $88,634 12,799
kW-mo/yr
Electricity Fees $41,380 -
Natural Gas $141,138 16,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $104,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $4,752 $3,880 $4,151
61,077
kWh
$601
-
kW-mo/yr
- - -
02 2.7145: Install skylights $17,275 $26,928 $17,275
254,192
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,966 $20 $12,198
179,494
kWh
$1,768
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $34,077 $400 $29,764
437,970
kWh
$4,313
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $498 $542 $435
6,400
kWh
$63
-
kW-mo/yr
- - -
06 2.2136: Install / repair insulation on steam lines $371 $63 - - $371
-
MMBtu
- -
07 2.7221: Lower temperature during the winter season and vice-versa $398 - $258
3,793
kWh
$140
-
kW-mo/yr
- - -
08 4.611: Begin a practice of predictive / preventative maintenance $89,018 $19,710 - - - $89,018 -
09 4.821: Pay bills on time to avoid late fees $819 $144 - - - - $819
TOTAL RECOMMENDED $161,174 $51,687 $64,081
942,926
kWh
$6,885
-
kW-mo/yr
$371
-
MMBtu
$89,018 $819
TOTAL IMPLEMENTED $104,672 $20,479 $12,633
185,894
kWh
$1,831
-
kW-mo/yr
$371
-
MMBtu
$89,018 $819
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs