Assessment Year | 2002 |
---|---|
Principal Product | Milk and Milk Jugs |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
35,000
ft2
|
Annual Production | 33,000
Tgal
|
Production Hrs. Annual | 6,192
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $900,660 | 20,444,404 |
kWh
|
$0.044 |
Electricity Fees | $136,413 | - |
|
- |
Natural Gas | $103,250 | 14,114 |
MMBtu
|
$7.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,406 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,862 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,170 | $4,422 |
$1,170
34,142
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $160 | $375 |
$160
3,247
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $540 | $675 |
$540
9,907
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,442 | $737 |
$1,442
42,454
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $10,487 | $2,091 |
$2,365
69,632
kWh
|
$8,122
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,223 | $9,800 |
$3,223
94,908
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $721 | $1,200 |
$721
16,564
kWh
|
- | - | |
08 | 3.4151: Minimize water usage | $663 | $3,000 | - | - |
$663
-
Tgal
|
|
TOTAL RECOMMENDED | $18,406 | $22,300 |
$9,621
270,854
kWh
|
$8,122
-
MMBtu
|
$663
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,862 | $17,725 |
$8,740
251,043
kWh
|
$8,122
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs