ITAC Assessment: AS0325
ITAC logo
ITAC Assessment: AS0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Slot Machines
NAICS
n/a
SIC 5045: Computers and Computer Peripheral Equipment and Software
Sales Range greater than $500
M
# of Employees 500
Plant Area 140,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,175 3,119,958
kWh
Electricity Demand $40,434 7,991
kW-mo/yr
Electricity Fees $20,176 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $212,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,971 $23,524 n/a $9,514
132,382
kWh
$3,457
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,032 $60 n/a $210
11,630
kWh
$822
-
kW-mo/yr
- - - - -
03 2.7221: Lower temperature during the winter season and vice-versa $3,721 $92 n/a $3,224
45,156
kWh
$497
-
kW-mo/yr
- - - - -
04 2.4314: Use synthetic lubricant $308 $279 n/a $134
1,901
kWh
$70
-
kW-mo/yr
- $104
-
gal
- - -
05 3.4111: Use closed cycle process to minimize waste water production $2,009 $4,550 n/a - - $2,009
-
Tgal
- - - -
06 4.431: Train operators for maximum operating efficiency $670 $240 n/a $145
2,044
kWh
- - - $525 - -
07 4.711: Initiate a total quality management program $15,570 $588 n/a - - - - - - $15,570
08 4.521: Clear and rent existing space $107,840 $21,700 n/a - - - - - $107,840 -
09 4.513: Re-arrange equipment layout to reduce labor costs $68,428 $9,216 n/a - - - - $68,428 - -
TOTAL RECOMMENDED $212,549 $60,249 $13,227
193,113
kWh
$4,846
-
kW-mo/yr
$2,009
-
Tgal
$104
-
gal
$68,953 $107,840 $15,570
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs