ITAC Assessment: AS0321
ITAC logo
ITAC Assessment: AS0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Acrylic bath tub liners and wall surrounds
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 49,000
ft2
Annual Production 51,000
pieces
Production Hrs. Annual 4,318
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,933 980,720
kWh
Electricity Demand $14,590 4,504
kW-mo/yr
Electricity Fees $5,078 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,476 $2,819 $1,125
19,879
kWh
$351
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $42,990 $2,700 - - - $42,990
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,666 $100 $1,377
90,593
kWh
$4,289
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $16,063 $4,370 $13,105
216,329
kWh
$2,958
-
kW-mo/yr
- -
05 4.111: Add equipment/ operators to reduce production bottleneck $4,394 $323 - - $4,394 -
TOTAL RECOMMENDED $70,589 $10,312 $15,607
326,801
kWh
$7,598
-
kW-mo/yr
$4,394 $42,990
TOTAL IMPLEMENTED $69,113 $7,493 $14,482
306,922
kWh
$7,247
-
kW-mo/yr
$4,394 $42,990
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs