| Assessment Year | 2002 |
|---|---|
| Principal Product | Acrylic bath tub liners and wall surrounds |
| NAICS |
n/a
|
| SIC | 3088: Plastics Plumbing Fixtures |
| Sales Range | $10 M to 50M |
| # of Employees | 76 |
| Plant Area |
49,000
ft2
|
| Annual Production | 51,000
pieces
|
| Production Hrs. Annual | 4,318
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $58,933 | 980,720 |
kWh
|
$0.060 |
| Electricity Demand | $14,590 | 4,504 |
kW-mo/yr
|
$3.24 |
| Electricity Fees | $5,078 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $70,589 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $69,113 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,476 | $2,819 |
$1,125
19,879
kWh
|
$351
-
kW-mo/yr
|
- | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $42,990 | $2,700 | - | - | - | $42,990 | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,666 | $100 |
$1,377
90,593
kWh
|
$4,289
-
kW-mo/yr
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $16,063 | $4,370 |
$13,105
216,329
kWh
|
$2,958
-
kW-mo/yr
|
- | - | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $4,394 | $323 | - | - | $4,394 | - | |
| TOTAL RECOMMENDED | $70,589 | $10,312 |
$15,607
326,801
kWh
|
$7,598
-
kW-mo/yr
|
$4,394 | $42,990 | ||
| TOTAL IMPLEMENTED | $69,113 | $7,493 |
$14,482
306,922
kWh
|
$7,247
-
kW-mo/yr
|
$4,394 | $42,990 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs