Assessment Year | 2001 |
---|---|
Principal Product | Wood household furniture |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 420 |
Plant Area |
108,000
ft2
|
Annual Production | 460,000
units
|
Production Hrs. Annual | 4,554
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $216,004 | 2,800,729 |
kWh
|
$0.077 |
Electricity Demand | $16,553 | 10,200 |
kW-mo/yr
|
$1.62 |
Electricity Fees | $16,824 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $126,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,836 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $2,092 | $1,500 |
$1,080
23,450
kWh
|
$1,012
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $311 | $1,254 |
$163
3,561
kWh
|
$148
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,929 | $31,000 |
$30,946
674,356
kWh
|
$13,983
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,661 | $180 |
$8,429
183,678
kWh
|
$4,232
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,639 | $24,888 |
$9,631
209,880
kWh
|
$4,008
-
kW-mo/yr
|
- | - | |
06 | 2.7145: Install skylights | $1,042 | $8,108 |
$1,042
15,179
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $71 | $225 |
$41
886
kWh
|
$30
-
kW-mo/yr
|
- | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,708 | $735 | - | - | - | $2,708 | |
09 | 4.431: Train operators for maximum operating efficiency | $49,133 | $8,028 | - | - | $49,133 | - | |
TOTAL RECOMMENDED | $126,586 | $75,918 |
$51,332
1,110,990
kWh
|
$23,413
-
kW-mo/yr
|
$49,133 | $2,708 | ||
TOTAL IMPLEMENTED | $77,836 | $35,850 |
$19,303
420,569
kWh
|
$9,400
-
kW-mo/yr
|
$49,133 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs