ITAC Assessment: AS0313
ITAC logo
ITAC Assessment: AS0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Wood household furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area 108,000
ft2
Annual Production 460,000
units
Production Hrs. Annual 4,554
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,004 2,800,729
kWh
Electricity Demand $16,553 10,200
kW-mo/yr
Electricity Fees $16,824 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $2,092 $1,500 $1,080
23,450
kWh
$1,012
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $311 $1,254 $163
3,561
kWh
$148
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,929 $31,000 $30,946
674,356
kWh
$13,983
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $12,661 $180 $8,429
183,678
kWh
$4,232
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,639 $24,888 $9,631
209,880
kWh
$4,008
-
kW-mo/yr
- -
06 2.7145: Install skylights $1,042 $8,108 $1,042
15,179
kWh
- - -
07 2.7135: Install occupancy sensors $71 $225 $41
886
kWh
$30
-
kW-mo/yr
- -
08 4.111: Add equipment/ operators to reduce production bottleneck $2,708 $735 - - - $2,708
09 4.431: Train operators for maximum operating efficiency $49,133 $8,028 - - $49,133 -
TOTAL RECOMMENDED $126,586 $75,918 $51,332
1,110,990
kWh
$23,413
-
kW-mo/yr
$49,133 $2,708
TOTAL IMPLEMENTED $77,836 $35,850 $19,303
420,569
kWh
$9,400
-
kW-mo/yr
$49,133 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs