ITAC Assessment: AS0311
ITAC logo
ITAC Assessment: AS0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Commercial printing and packaging
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 47,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 5,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,616 1,261,800
kWh
Electricity Fees $12,044 -
Natural Gas $1,294 125
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,056 $112 $1,056
9,950
kWh
- -
02 2.7135: Install occupancy sensors $404 $225 $404
3,810
kWh
- -
03 3.5316: Contract a wood pallet recycling company $1,920 $60 - - $1,920
04 4.445: Install equipment to move product $40,872 $100,000 - $40,872 -
05 4.323: Optimize lot sizes to reduce inventory carrying costs $7,765 $4,414 - - $7,765
06 4.431: Train operators for maximum operating efficiency $36,000 $1,078 - - $36,000
TOTAL RECOMMENDED $88,017 $105,889 $1,460
13,760
kWh
$40,872 $45,685
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs