Assessment Year | 2001 |
---|---|
Principal Product | Mill work and wood doors |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 48 |
Plant Area |
26,600
ft2
|
Annual Production | 8,000
units
|
Production Hrs. Annual | 2,151
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $14,099 | 225,829 |
kWh
|
$0.062 |
Electricity Demand | $1,980 | 839 |
kW-mo/yr
|
$2.36 |
Electricity Fees | $1,757 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,827 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,341 | $3,800 |
$1,497
26,543
kWh
|
$844
-
kW-mo/yr
|
- | - | |
02 | 2.7124: Make a practice of turning off lights when not needed | $426 | $480 |
$426
7,550
kWh
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $305 | $60 |
$157
2,788
kWh
|
$148
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $962 | $4,006 |
$705
12,507
kWh
|
$257
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $22 | $75 |
$15
260
kWh
|
$7
-
kW-mo/yr
|
- | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $585 | $1,400 |
$410
7,267
kWh
|
$175
-
kW-mo/yr
|
- | - | |
07 | 3.6192: Use a less expensive method of waste removal | $5,413 | $60 | - | - | $5,413 | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,773 | $685 | - | - | - | $2,773 | |
TOTAL RECOMMENDED | $12,827 | $10,566 |
$3,210
56,915
kWh
|
$1,431
-
kW-mo/yr
|
$5,413 | $2,773 | ||
TOTAL IMPLEMENTED | $12,805 | $10,491 |
$3,195
56,655
kWh
|
$1,424
-
kW-mo/yr
|
$5,413 | $2,773 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs