ITAC Assessment: AS0309
ITAC logo
ITAC Assessment: AS0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Mill work and wood doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 26,600
ft2
Annual Production 8,000
units
Production Hrs. Annual 2,151
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,099 225,829
kWh
Electricity Demand $1,980 839
kW-mo/yr
Electricity Fees $1,757 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,341 $3,800 $1,497
26,543
kWh
$844
-
kW-mo/yr
- -
02 2.7124: Make a practice of turning off lights when not needed $426 $480 $426
7,550
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $305 $60 $157
2,788
kWh
$148
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $962 $4,006 $705
12,507
kWh
$257
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $22 $75 $15
260
kWh
$7
-
kW-mo/yr
- -
06 2.7232: Replace existing hvac unit with high efficiency model $585 $1,400 $410
7,267
kWh
$175
-
kW-mo/yr
- -
07 3.6192: Use a less expensive method of waste removal $5,413 $60 - - $5,413 -
08 4.111: Add equipment/ operators to reduce production bottleneck $2,773 $685 - - - $2,773
TOTAL RECOMMENDED $12,827 $10,566 $3,210
56,915
kWh
$1,431
-
kW-mo/yr
$5,413 $2,773
TOTAL IMPLEMENTED $12,805 $10,491 $3,195
56,655
kWh
$1,424
-
kW-mo/yr
$5,413 $2,773
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs