ITAC Assessment: AS0306
ITAC logo
ITAC Assessment: AS0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Custom wood and aluminum exterior and interior
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 75,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,662
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,078 1,643,320
kWh
Electricity Demand $13,132 5,266
kW-mo/yr
Electricity Fees $9,876 -
Natural Gas $10,466 1,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $702 $1,200 $352
8,784
kWh
$350
-
kW-mo/yr
-
02 2.7124: Make a practice of turning off lights when not needed $225 $225 $225
5,616
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,216 $6,238 $1,096
27,335
kWh
$1,120
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,534 $15 $894
22,300
kWh
$640
-
kW-mo/yr
-
05 3.6192: Use a less expensive method of waste removal $3,192 $60 - - $3,192
TOTAL RECOMMENDED $7,869 $7,738 $2,567
64,035
kWh
$2,110
-
kW-mo/yr
$3,192
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs