ITAC Assessment: AS0305
ITAC logo
ITAC Assessment: AS0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Fabricated Metal Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 85,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 2,887
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,442 973,110
kWh
Electricity Demand $9,335 3,972
kW-mo/yr
Electricity Fees $7,607 -
Natural Gas $8,178 828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7145: Install skylights $8,175 $16,112 $8,175
145,018
kWh
- - - -
02 2.7135: Install occupancy sensors $155 $225 $116
2,062
kWh
$39
-
kW-mo/yr
- - -
03 2.7232: Replace existing hvac unit with high efficiency model $1,492 $3,850 $1,184
21,005
kWh
$308
-
kW-mo/yr
- - -
04 2.4314: Use synthetic lubricant $592 $277 $267
4,735
kWh
$112
-
kW-mo/yr
- $213 -
05 3.6192: Use a less expensive method of waste removal $4,588 $110 - - $4,588 - -
06 4.711: Initiate a total quality management program $14,000 $1,360 - - - - $14,000
07 4.513: Re-arrange equipment layout to reduce labor costs $63,963 $6,820 - - $63,963 - -
TOTAL RECOMMENDED $92,965 $28,754 $9,742
172,820
kWh
$459
-
kW-mo/yr
$68,551 $213 $14,000
TOTAL IMPLEMENTED $82,551 $8,290 - - $68,551 - $14,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs