ITAC Assessment: AS0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial and automotive spray booths
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 34
Plant Area 12,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,633 346,475
kWh
Electricity Demand $2,990 1,881
kW-mo/yr
Electricity Fees $2,643 -
Natural Gas $31,766 5,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,381 $2,549 $1,138
15,314
kWh
$243
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,767 $5,107 $1,980
22,354
kWh
$787
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $388 $388 $279
3,759
kWh
$109
-
kW-mo/yr
- - -
04 3.6192: Use a less expensive method of waste removal $4,032 $110 - - - - $4,032
05 4.454: Modify startup/shutdown times $48,788 $383 - - $28,559
-
MMBtu
$20,229 -
TOTAL RECOMMENDED $57,356 $8,537 $3,397
41,427
kWh
$1,139
-
kW-mo/yr
$28,559
-
MMBtu
$20,229 $4,032
TOTAL IMPLEMENTED $4,032 $110 - - - - $4,032
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs