ITAC Assessment: AS0294
ITAC logo
ITAC Assessment: AS0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bread and Bakery Products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 250,000
ft2
Annual Production 81,476,948
lb
Production Hrs. Annual 7,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,012 8,167,500
kWh
Electricity Demand $29,630 17,146
kW-mo/yr
Electricity Fees $29,655 -
Natural Gas $319,715 56,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $1,268 $2,070 $986
20,974
kWh
$282
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,366 $6,076 $5,042
107,280
kWh
$1,324
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $5,492 $15,000 $4,441
94,504
kWh
$1,051
-
kW-mo/yr
04 2.7145: Install skylights $1,527 $3,086 $1,527
32,498
kWh
-
TOTAL RECOMMENDED $14,653 $26,232 $11,996
255,256
kWh
$2,657
-
kW-mo/yr
TOTAL IMPLEMENTED $13,126 $23,146 $10,469
222,758
kWh
$2,657
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs