ITAC Assessment: AS0284
ITAC logo
ITAC Assessment: AS0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wood and Laminated Office and Store Fixtures
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 86
Plant Area 91,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 2,431
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,471 943,728
kWh
Electricity Demand $9,409 3,606
kW-mo/yr
Electricity Fees $6,280 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,064 $2,486 $719
12,896
kWh
$345
-
kW-mo/yr
- - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,003 $800 $1,003
17,878
kWh
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,564 $3,800 $6,987
123,974
kWh
$3,577
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,270 $60 $1,270
22,567
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $809 $100 $535
9,379
kWh
$274
-
kW-mo/yr
- - -
06 3.6192: Use a less expensive method of waste removal $852 $60 - - - - $852
07 3.5217: Reuse / recycle/ sell paper products $315 $60 - - $315
-
lb
- -
08 4.821: Pay bills on time to avoid late fees $771 $60 - - - - $771
09 4.432: Cross-train personnel to avoid lost time $14,280 $2,240 - - - $14,280 -
TOTAL RECOMMENDED $30,928 $9,666 $10,514
186,694
kWh
$4,196
-
kW-mo/yr
$315
-
lb
$14,280 $1,623
TOTAL IMPLEMENTED $17,320 $4,946 $1,254
22,275
kWh
$619
-
kW-mo/yr
$315
-
lb
$14,280 $852
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs