Assessment Year | 2000 |
---|---|
Principal Product | Screen Printing and Hot Stamping on Plastics |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
64,000
ft2
|
Annual Production | 34,710,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,158 | 1,736,811 |
kWh
|
$0.068 |
Electricity Demand | $7,804 | 4,548 |
kW-mo/yr
|
$1.72 |
Electricity Fees | $8,600 | - |
|
- |
LPG | $10,506 | 554 |
MMBtu
|
$18.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $308,488 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,286 | $7,561 |
$1,449
30,774
kWh
|
$837
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $284 | $128 |
$113
2,345
kWh
|
$66
-
kW-mo/yr
|
- | - | $91 | - | $14 | - | |
03 | 2.7135: Install occupancy sensors | $1,024 | $1,575 |
$786
16,706
kWh
|
$238
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $358 | $60 |
$358
7,620
kWh
|
- | - | - | - | - | - | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,045 | $120 |
$2,045
43,083
kWh
|
- | - | - | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $614 | $696 |
$320
6,741
kWh
|
$64
-
kW-mo/yr
|
- | - | $114 | - | $116 | - | |
07 | 2.1123: Install automatic stack damper | $766 | $594 |
$766
16,120
kWh
|
- | - | - | - | - | - | - | |
08 | 3.6192: Use a less expensive method of waste removal | $3,159 | $340 | - | - | - | - | - | $3,159 | - | - | |
09 | 4.112: Replace old machine with new automatic multi-station tool | $287,576 | $100,000 | - | - | - | - | $53,125 | - | - | $234,451 | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $3,750 | $8,000 | - | - | - | - | $3,750 | - | - | - | |
11 | 2.1332: Convert combustion equipment to burn natural gas | $6,626 | $1,300 | - | - |
$(-3,878.0)
-
MMBtu
|
$10,504
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $308,488 | $120,374 |
$5,837
123,389
kWh
|
$1,205
-
kW-mo/yr
|
$(-3,878.0)
-
MMBtu
|
$10,504
-
MMBtu
|
$57,080 | $3,159 | $130 | $234,451 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs