| Assessment Year | 2000 |
|---|---|
| Principal Product | Screen Printing and Hot Stamping on Plastics |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
64,000
ft2
|
| Annual Production | 34,710,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $118,158 | 1,736,811 |
kWh
|
$0.068 |
| Electricity Demand | $7,804 | 4,548 |
kW-mo/yr
|
$1.72 |
| Electricity Fees | $8,600 | - |
|
- |
| LPG | $10,506 | 554 |
MMBtu
|
$18.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $308,488 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,286 | $7,561 |
$1,449
30,774
kWh
|
$837
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $284 | $128 |
$113
2,345
kWh
|
$66
-
kW-mo/yr
|
- | - | $91 | - | $14 | - | |
| 03 | 2.7135: Install occupancy sensors | $1,024 | $1,575 |
$786
16,706
kWh
|
$238
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $358 | $60 |
$358
7,620
kWh
|
- | - | - | - | - | - | - | |
| 05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,045 | $120 |
$2,045
43,083
kWh
|
- | - | - | - | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $614 | $696 |
$320
6,741
kWh
|
$64
-
kW-mo/yr
|
- | - | $114 | - | $116 | - | |
| 07 | 2.1123: Install automatic stack damper | $766 | $594 |
$766
16,120
kWh
|
- | - | - | - | - | - | - | |
| 08 | 3.6192: Use a less expensive method of waste removal | $3,159 | $340 | - | - | - | - | - | $3,159 | - | - | |
| 09 | 4.112: Replace old machine with new automatic multi-station tool | $287,576 | $100,000 | - | - | - | - | $53,125 | - | - | $234,451 | |
| 10 | 4.652: Replace existing equipment with more suitable substitutes | $3,750 | $8,000 | - | - | - | - | $3,750 | - | - | - | |
| 11 | 2.1332: Convert combustion equipment to burn natural gas | $6,626 | $1,300 | - | - |
$(-3,878.0)
-
MMBtu
|
$10,504
-
MMBtu
|
- | - | - | - | |
| TOTAL RECOMMENDED | $308,488 | $120,374 |
$5,837
123,389
kWh
|
$1,205
-
kW-mo/yr
|
$(-3,878.0)
-
MMBtu
|
$10,504
-
MMBtu
|
$57,080 | $3,159 | $130 | $234,451 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs