ITAC Assessment: AS0266
ITAC logo
ITAC Assessment: AS0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Oak Cabinets
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 82,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,900
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,691 1,852,579
kWh
Electricity Demand $14,593 5,460
kW-mo/yr
Electricity Fees $9,141 -
Natural Gas $11,121 1,793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,785 $7,353 n/a $1,524
39,859
kWh
$1,261
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $574 $1,050 n/a $342
9,086
kWh
$232
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $304 $377 n/a $129
3,517
kWh
$48
-
kW-mo/yr
$62 - $65
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $122 $100 n/a $54
1,465
kWh
$68
-
kW-mo/yr
- - -
05 2.6218: Turn off equipment when not in use $1,039 $60 n/a $1,039
27,257
kWh
- - - -
06 2.4131: Size electric motors for peak operating efficiency $4,615 $7,674 n/a $1,813
47,479
kWh
$2,802
-
kW-mo/yr
- - -
07 3.6192: Use a less expensive method of waste removal $472 $120 n/a - - - $472 -
08 4.111: Add equipment/ operators to reduce production bottleneck $172,500 $26,000 n/a - - $172,500 - -
09 4.652: Replace existing equipment with more suitable substitutes $1,626 $240 n/a - - $2,376 - $(-750.0)
TOTAL RECOMMENDED $184,037 $42,974 $4,901
128,663
kWh
$4,411
-
kW-mo/yr
$174,938 $472 $(-685.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs