Assessment Year | 1999 |
---|---|
Principal Product | Aircraft |
NAICS |
n/a
|
SIC | 3721: Aircraft |
Sales Range | $50 M to 100M |
# of Employees | 500 |
Plant Area |
260,067
ft2
|
Annual Production | 42
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $281,857 | 3,612,251 |
kWh
|
$0.078 |
Electricity Demand | $49,494 | 8,188 |
kW-mo/yr
|
$6.04 |
Electricity Fees | $17,381 | - |
|
- |
Natural Gas | $112,559 | 17,409 |
MMBtu
|
$6.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $169,995 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $6,547 | $4,500 |
$5,724
85,873
kWh
|
$823
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $9,763 | $2,550 |
$9,262
138,921
kWh
|
$501
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,273 | $1,496 |
$741
11,137
kWh
|
$102
-
kW-mo/yr
|
$217 | - | $213 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,376 | $14,720 |
$11,751
198,124
kWh
|
$1,625
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,301 | $22,500 |
$25,458
381,887
kWh
|
$3,843
-
kW-mo/yr
|
- | - | - | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,880 | $4,220 |
$4,880
73,271
kWh
|
- | - | - | - | |
07 | 2.7132: Install timers on light switches in little used areas | $22,194 | $2,804 |
$22,194
332,943
kWh
|
- | - | - | - | |
08 | 2.3512: De-energize excess transformer capacity | $23,808 | $59,466 |
$8,238
123,681
kWh
|
- | - | - | $15,570 | |
09 | 3.6192: Use a less expensive method of waste removal | $3,644 | $120 | - | - | - | $3,644 | - | |
10 | 3.6192: Use a less expensive method of waste removal | $3,507 | $30 | - | - | - | $3,507 | - | |
11 | 2.8114: Change rate schedules or other changes in utility service | $51,702 | $240 | - | - | - | $51,702 | - | |
TOTAL RECOMMENDED | $169,995 | $112,646 |
$88,248
1,345,837
kWh
|
$6,894
-
kW-mo/yr
|
$217 | $58,853 | $15,783 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs