ITAC Assessment: AS0256
ITAC logo
ITAC Assessment: AS0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aircraft
NAICS
n/a
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 260,067
ft2
Annual Production 42
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,857 3,612,251
kWh
Electricity Demand $49,494 8,188
kW-mo/yr
Electricity Fees $17,381 -
Natural Gas $112,559 17,409
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $6,547 $4,500 $5,724
85,873
kWh
$823
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $9,763 $2,550 $9,262
138,921
kWh
$501
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,273 $1,496 $741
11,137
kWh
$102
-
kW-mo/yr
$217 - $213
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,376 $14,720 $11,751
198,124
kWh
$1,625
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $29,301 $22,500 $25,458
381,887
kWh
$3,843
-
kW-mo/yr
- - -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,880 $4,220 $4,880
73,271
kWh
- - - -
07 2.7132: Install timers on light switches in little used areas $22,194 $2,804 $22,194
332,943
kWh
- - - -
08 2.3512: De-energize excess transformer capacity $23,808 $59,466 $8,238
123,681
kWh
- - - $15,570
09 3.6192: Use a less expensive method of waste removal $3,644 $120 - - - $3,644 -
10 3.6192: Use a less expensive method of waste removal $3,507 $30 - - - $3,507 -
11 2.8114: Change rate schedules or other changes in utility service $51,702 $240 - - - $51,702 -
TOTAL RECOMMENDED $169,995 $112,646 $88,248
1,345,837
kWh
$6,894
-
kW-mo/yr
$217 $58,853 $15,783
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs