Assessment Year | 1998 |
---|---|
Principal Product | Cardboard Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
150,000
ft2
|
Annual Production | 50,000
ton
|
Production Hrs. Annual | 6,400
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $208,235 | 5,980,070 |
kWh
|
$0.035 |
Electricity Demand | $103,907 | 12,865 |
kW-mo/yr
|
$8.08 |
Electricity Fees | $55,666 | - |
|
- |
Natural Gas | $319,354 | 79,576 |
MMBtu
|
$4.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $186,336 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,266 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,249 | $280 |
$12,464
345,838
kWh
|
$5,785
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,087 | $3,745 |
$559
15,533
kWh
|
$528
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,243 | $120 |
$2,221
61,547
kWh
|
$1,022
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,365 | $60 |
$3,365
93,200
kWh
|
- | - | - | - | - | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $6,487 | $8,291 |
$4,442
122,802
kWh
|
$2,045
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $51,367 | $40,600 |
$35,178
973,623
kWh
|
$16,189
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $784 | $480 |
$784
21,688
kWh
|
- | - | - | - | - | - | - | - | |
08 | 3.4154: Eliminate leaks in water lines and valves | $407 | $220 | - | - |
$218
-
MMBtu
|
$189
-
Tgal
|
- | - | - | - | - | |
09 | 3.4113: Treat and reuse rinse waters | $18,575 | $800 | - | - | - | - |
$18,575
-
gal
|
- | - | - | - | |
10 | 3.5313: Increase amount of waste recovered for resale | $9,828 | $48,000 | - | - | - | - | - |
$2,548
-
lb
|
- | - | $7,280 | |
11 | 3.7121: Improve handling practices | $5,156 | $850 | - | - | - | - | - | - | $5,156 | - | - | |
12 | 4.521: Clear and rent existing space | $67,788 | $3,600 | - | - | - | - | - | - | - | $67,788 | - | |
TOTAL RECOMMENDED | $186,336 | $107,046 |
$59,013
1,634,231
kWh
|
$25,569
-
kW-mo/yr
|
$218
-
MMBtu
|
$189
-
Tgal
|
$18,575
-
gal
|
$2,548
-
lb
|
$5,156 | $67,788 | $7,280 | ||
TOTAL IMPLEMENTED | $56,266 | $11,101 |
$23,276
645,075
kWh
|
$8,852
-
kW-mo/yr
|
$218
-
MMBtu
|
$189
-
Tgal
|
$18,575
-
gal
|
- | $5,156 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs