| Assessment Year | 1998 |
|---|---|
| Principal Product | Steel Decking |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 32 |
| Plant Area |
20,000
ft2
|
| Annual Production | 1,680
thousand feet
|
| Production Hrs. Annual | 2,100
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,758 | 409,437 |
kWh
|
$0.070 |
| Electricity Demand | $6,345 | 2,436 |
kW-mo/yr
|
$2.60 |
| Electricity Fees | $37,706 | - |
|
- |
| Natural Gas | $25,903 | 5,166 |
MMBtu
|
$5.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $85,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,921 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,150 | $2,888 |
$995
13,775
kWh
|
$155
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 02 | 2.4314: Use synthetic lubricant | $101 | $268 |
$38
586
kWh
|
$6
-
kW-mo/yr
|
- |
$6
-
gal
|
- | - | $51 | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,071 | $60 |
$1,777
24,619
kWh
|
$294
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,138 | $2,957 |
$977
13,482
kWh
|
$161
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,425 | $1,500 |
$2,299
31,653
kWh
|
$126
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 06 | 3.6192: Use a less expensive method of waste removal | $36 | $30 | - | - | - | - | - | $36 | - | - | |
| 07 | 4.514: Re-arrange equipment layout to reduce handling costs | $72,920 | $15,300 | - | - | - | - | - | - | - | $72,920 | |
| 08 | 4.513: Re-arrange equipment layout to reduce labor costs | $5,983 | $10,352 |
$45
586
kWh
|
$(-17.0)
-
kW-mo/yr
|
$1,059
-
MMBtu
|
- | $4,896 | - | - | - | |
| TOTAL RECOMMENDED | $85,824 | $33,355 |
$6,131
84,701
kWh
|
$725
-
kW-mo/yr
|
$1,059
-
MMBtu
|
$6
-
gal
|
$4,896 | $36 | $51 | $72,920 | ||
| TOTAL IMPLEMENTED | $6,921 | $7,703 |
$6,086
84,115
kWh
|
$742
-
kW-mo/yr
|
- |
$6
-
gal
|
- | $36 | $51 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs