ITAC Assessment: AS0218
ITAC logo
ITAC Assessment: AS0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Refrigerators and Freezers
NAICS
n/a
SIC 3632: Household Refrigerators and HOme and Farm Freezers
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 120,000
ft2
Annual Production 19,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,441 2,787,808
kWh
Electricity Demand $20,362 11,492
kW-mo/yr
Electricity Fees $15,917 -
Natural Gas $35,084 7,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,620,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $681 $3,333 $403
8,206
kWh
$278
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $457 $1,200 $174
5,862
kWh
$283
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $333 $284 $136
4,103
kWh
$197
-
kW-mo/yr
- - -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $417 $320 $417
8,499
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $249 $406 $210
4,396
kWh
$39
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $2,335 $4,124 $1,558
31,946
kWh
$777
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,347 $9,180 $2,347
48,359
kWh
- - - -
08 2.7232: Replace existing hvac unit with high efficiency model $1,225 $3,150 $992
20,516
kWh
$233
-
kW-mo/yr
- - -
09 3.5316: Contract a wood pallet recycling company $1,775 $60 - - $1,775 - -
10 3.6192: Use a less expensive method of waste removal $941 $60 - - $941 - -
11 4.621: Use fixtures to reduce machine changeout times $1,609,654 $4,960 $1,934
39,859
kWh
$965
-
kW-mo/yr
- $(-3,245.0) $1,610,000
TOTAL RECOMMENDED $1,620,414 $27,077 $8,171
171,746
kWh
$2,772
-
kW-mo/yr
$2,716 $(-3,245.0) $1,610,000
TOTAL IMPLEMENTED $7,275 $8,404 $3,313
69,460
kWh
$1,246
-
kW-mo/yr
$2,716 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs