Assessment Year | 1998 |
---|---|
Principal Product | Refrigerators and Freezers |
NAICS |
n/a
|
SIC | 3632: Household Refrigerators and HOme and Farm Freezers |
Sales Range | $10 M to 50M |
# of Employees | 156 |
Plant Area |
120,000
ft2
|
Annual Production | 19,000
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $211,441 | 2,787,808 |
kWh
|
$0.076 |
Electricity Demand | $20,362 | 11,492 |
kW-mo/yr
|
$1.77 |
Electricity Fees | $15,917 | - |
|
- |
Natural Gas | $35,084 | 7,018 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,620,414 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,275 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Raw Material Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $681 | $3,333 |
$403
8,206
kWh
|
$278
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $457 | $1,200 |
$174
5,862
kWh
|
$283
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $333 | $284 |
$136
4,103
kWh
|
$197
-
kW-mo/yr
|
- | - | - | |
04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $417 | $320 |
$417
8,499
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $249 | $406 |
$210
4,396
kWh
|
$39
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,335 | $4,124 |
$1,558
31,946
kWh
|
$777
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,347 | $9,180 |
$2,347
48,359
kWh
|
- | - | - | - | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $1,225 | $3,150 |
$992
20,516
kWh
|
$233
-
kW-mo/yr
|
- | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $1,775 | $60 | - | - | $1,775 | - | - | |
10 | 3.6192: Use a less expensive method of waste removal | $941 | $60 | - | - | $941 | - | - | |
11 | 4.621: Use fixtures to reduce machine changeout times | $1,609,654 | $4,960 |
$1,934
39,859
kWh
|
$965
-
kW-mo/yr
|
- | $(-3,245.0) | $1,610,000 | |
TOTAL RECOMMENDED | $1,620,414 | $27,077 |
$8,171
171,746
kWh
|
$2,772
-
kW-mo/yr
|
$2,716 | $(-3,245.0) | $1,610,000 | ||
TOTAL IMPLEMENTED | $7,275 | $8,404 |
$3,313
69,460
kWh
|
$1,246
-
kW-mo/yr
|
$2,716 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Raw Material Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs