ITAC Assessment: AS0212
ITAC logo
ITAC Assessment: AS0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Iron and Steel Castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 250,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $820,623 27,550,704
kWh
Electricity Demand $194,498 176,600
kW-mo/yr
Electricity Fees $158,533 -
Natural Gas $318,883 101,183
MMBtu
LPG $21,967 1,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,290,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,076 $13,917 $1,980
62,134
kWh
$2,096
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $1,611 $2,475 $830
26,084
kWh
$781
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,975 $24,800 $4,541
130,715
kWh
$434
-
kW-mo/yr
- - - - -
04 2.4314: Use synthetic lubricant $878 $800 $339
9,672
kWh
$210
-
kW-mo/yr
$37
-
gal
- $292 - -
05 2.7232: Replace existing hvac unit with high efficiency model $2,536 $4,800 $1,507
47,186
kWh
$1,029
-
kW-mo/yr
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,877 - $2,657
55,979
kWh
$220
-
kW-mo/yr
- - - - -
07 2.4133: Use most efficient type of electric motors $3,979 $8,806 $2,593
78,546
kWh
$1,386
-
kW-mo/yr
- - - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $53,109 $64,120 $29,730
827,667
kWh
$23,379
-
kW-mo/yr
- - - - -
09 3.6192: Use a less expensive method of waste removal $432 $60 - - - $432 - - -
10 3.6192: Use a less expensive method of waste removal $4,320 $120 - - - $4,320 - - -
11 4.212: Adopt in-house material generation $10,130 $10,250 $(-38.0)
12,309
kWh
$(-27.0)
-
kW-mo/yr
- - $10,235 $(-40.0)
-
Tgal
-
12 4.652: Replace existing equipment with more suitable substitutes $5,201,240 $28,946 - - - - - - $5,201,240
TOTAL RECOMMENDED $5,290,163 $159,094 $44,139
1,250,292
kWh
$29,508
-
kW-mo/yr
$37
-
gal
$4,752 $10,527 $(-40.0)
-
Tgal
$5,201,240
TOTAL IMPLEMENTED $21,828 $40,710 $9,006
255,861
kWh
$1,866
-
kW-mo/yr
$37
-
gal
$432 $10,527 $(-40.0)
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs