Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Packaging
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 72,000
thousand feet
Production Hrs. Annual 3,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,676 1,028,429
kWh
Electricity Demand $8,802 3,164
kW-mo/yr
Electricity Fees $6,339 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $1,173 $1,725 $841
15,240
kWh
$332
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,090 $7,878 $2,121
38,394
kWh
$969
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $526 $30 $384
7,034
kWh
$142
-
kW-mo/yr
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,328 $90 $901
16,413
kWh
$427
-
kW-mo/yr
-
05 2.7226: Use computer programs to optimize hvac performance $3,776 $2,985 - $3,776
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $21,316 $8,000 $18,402
333,529
kWh
$2,914
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $659 $1,981 $431
7,913
kWh
$228
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $326 $60 $213
3,810
kWh
$113
-
kW-mo/yr
-
09 3.6192: Use a less expensive method of waste removal $750 $30 - - $750
10 3.6192: Use a less expensive method of waste removal $9,840 $60 - - $9,840
11 2.8114: Change rate schedules or other changes in utility service $648 $30 - - $648
TOTAL RECOMMENDED $43,432 $22,869 $23,293
422,333
kWh
$8,901
-
kW-mo/yr
$11,238
TOTAL IMPLEMENTED $526 $30 $384
7,034
kWh
$142
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs