Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Integrated Circuits
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $1
M
to 5
M
# of Employees 350
Plant Area 101,947
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,064 6,452,228
kWh
Electricity Demand $29,708 10,860
kW-mo/yr
Electricity Fees $25,645 -
Natural Gas $16,543 3,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $312 - $134
3,517
kWh
$178
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $861 $570 $619
16,120
kWh
$242
-
kW-mo/yr
- -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $393 $300 $280
7,327
kWh
$113
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $3,343 $3,980 $2,602
67,409
kWh
$741
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $188 - $135
3,517
kWh
$53
-
kW-mo/yr
- -
06 3.1191: Change procedures / equipment / operating conditions $1,880 $1,880 - - $1,880
-
Tgal
-
07 3.4151: Minimize water usage $800 - - - $800
-
Tgal
-
08 4.811: Demolish old building to reduce tax and insurance bills $1,460 $75 - - - $1,460
09 4.512: Condense operation into one building $109,695 $15,000 $8,822
228,605
kWh
$12,188
-
kW-mo/yr
- $88,685
TOTAL RECOMMENDED $118,932 $21,805 $12,592
326,495
kWh
$13,515
-
kW-mo/yr
$2,680
-
Tgal
$90,145
TOTAL IMPLEMENTED $112,016 $15,645 $9,441
244,725
kWh
$12,430
-
kW-mo/yr
- $90,145
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs