ITAC Assessment: AS0202
ITAC logo
ITAC Assessment: AS0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 200,000
ft2
Annual Production 840,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,035 4,687,866
kWh
Electricity Demand $24,900 9,528
kW-mo/yr
Electricity Fees $20,278 -
Natural Gas $193,444 45,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $16,012 $11,499 $13,116
240,621
kWh
$2,896
-
kW-mo/yr
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,445 $8,160 $5,279
97,011
kWh
$1,166
-
kW-mo/yr
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,839 $12 $1,506
27,550
kWh
$333
-
kW-mo/yr
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,907 $3,500 $2,002
36,635
kWh
$442
-
kW-mo/yr
- $(-537.0)
-
MMBtu
- -
05 2.7232: Replace existing hvac unit with high efficiency model $1,182 $3,000 $891
16,413
kWh
$291
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,084 $9,599 $2,270
41,618
kWh
$814
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $766 $1,350 $637
11,723
kWh
$129
-
kW-mo/yr
- - - -
08 2.7111: Reduce illumination to minimum necessary levels $2,753 - $2,255
41,325
kWh
$498
-
kW-mo/yr
- - - -
09 3.4152: Carefully control water level in mass finishing equipment $665 - - - - - $665
-
Tgal
-
10 3.4113: Treat and reuse rinse waters $940 $500 - - - - $940
-
Tgal
-
11 2.8114: Change rate schedules or other changes in utility service $25,407 $200 - - $25,407 - - -
12 4.521: Clear and rent existing space $93,500 $750 - - - - - $93,500
TOTAL RECOMMENDED $154,500 $38,570 $27,956
512,896
kWh
$6,569
-
kW-mo/yr
$25,407 $(-537.0)
-
MMBtu
$1,605
-
Tgal
$93,500
TOTAL IMPLEMENTED $23,722 $24,610 $17,783
326,202
kWh
$4,334
-
kW-mo/yr
- - $1,605
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs