ITAC Assessment: AS0196
ITAC logo
ITAC Assessment: AS0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Processed Meats
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 15,000
ft2
Annual Production 40,800,000
lb
Production Hrs. Annual 4,208
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,804 1,398,886
kWh
Electricity Demand $39,782 3,461
kW-mo/yr
Electricity Fees $11,531 -
Natural Gas $15,866 3,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings By-product Production Savings
01 2.6218: Turn off equipment when not in use $1,135 - $1,135
12,016
kWh
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,489 $120 $1,538
25,498
kWh
$951
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $3,559 $3,945 $1,461
26,084
kWh
$2,098
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,068 $2,154 $681
12,309
kWh
$387
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $885 $675 $885
8,792
kWh
- - - - -
06 3.4154: Eliminate leaks in water lines and valves $73 $194 - - $51
-
MMBtu
$22
-
Tgal
- -
07 3.4151: Minimize water usage $422 - - - - $422
-
Tgal
- -
08 4.811: Demolish old building to reduce tax and insurance bills $4,589 $1,300 - - - - $4,589 -
09 4.521: Clear and rent existing space $9,660 $10,000 - - - - - $9,660
TOTAL RECOMMENDED $23,880 $18,388 $5,700
84,699
kWh
$3,436
-
kW-mo/yr
$51
-
MMBtu
$444
-
Tgal
$4,589 $9,660
TOTAL IMPLEMENTED $11,595 $6,234 $3,884
60,374
kWh
$3,049
-
kW-mo/yr
$51
-
MMBtu
$22
-
Tgal
$4,589 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs