ITAC Assessment: AS0185
ITAC logo
ITAC Assessment: AS0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bread
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 120,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 4,590
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,340 2,226,846
kWh
Electricity Demand $36,938 4,972
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,863

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,866 - $1,866
29,015
kWh
- -
02 2.4235: Remove or close off unneeded compressed air lines $1,309 $255 $845
13,189
kWh
$464
-
kW-mo/yr
-
03 2.4235: Remove or close off unneeded compressed air lines $416 $120 $175
2,638
kWh
$241
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $882 $100 $657
10,258
kWh
$225
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,378 $1,938 $1,866
29,015
kWh
$512
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $688 $1,400 $429
7,913
kWh
$259
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $1,230 $1,050 $1,230
19,343
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $103 $128 $80
1,172
kWh
$23
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $590 $1,236 $415
6,448
kWh
$175
-
kW-mo/yr
-
10 3.7121: Improve handling practices $3,909 $1,500 - - $3,909
-
lb
TOTAL RECOMMENDED $13,371 $7,727 $7,563
118,991
kWh
$1,899
-
kW-mo/yr
$3,909
-
lb
TOTAL IMPLEMENTED $10,863 $4,041 $5,489
85,287
kWh
$1,465
-
kW-mo/yr
$3,909
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs