ITAC Assessment: AS0175
ITAC logo
ITAC Assessment: AS0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printing Circuit Board
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area 38,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,141 4,572,685
kWh
Electricity Demand $32,325 10,147
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Water Consumption Savings
01 2.4224: Upgrade controls on compressors $3,647 $11,000 $3,313
52,462
kWh
$334
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,105 $6,800 $4,638
73,271
kWh
$467
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $6,925 $6,300 $5,677
89,683
kWh
$1,248
-
kW-mo/yr
- -
04 2.2622: Replace existing chiller with high efficiency model $27,635 $25,000 $34,214
541,032
kWh
$4,722
-
kW-mo/yr
- $(-11,301.0)
-
Tgal
05 2.7135: Install occupancy sensors $1,625 $1,350 $1,625
25,791
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,214 $21,652 $6,511
102,872
kWh
$703
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $237 $499 $222
3,517
kWh
$15
-
kW-mo/yr
- -
08 3.6112: Use filter and drying oven to reduce sludge volume $8,910 $1,200 - - $8,910
-
lb
-
TOTAL RECOMMENDED $61,298 $73,801 $56,200
888,628
kWh
$7,489
-
kW-mo/yr
$8,910
-
lb
$(-11,301.0)
-
Tgal
TOTAL IMPLEMENTED $16,001 $29,801 $14,035
221,863
kWh
$1,966
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs