ITAC Assessment: AS0165
ITAC logo
ITAC Assessment: AS0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Colored Plastic Resins
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,679 719,519
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,443 $8,000 n/a $4,443
45,428
kWh
02 2.4133: Use most efficient type of electric motors $3,309 $3,918 n/a $3,309
31,946
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $391 - n/a $391
3,810
kWh
04 2.6212: Turn off equipment during breaks, reduce operating time $1,748 $426 n/a $1,748
23,447
kWh
05 2.2511: Insulate bare equipment $1,409 $4,988 n/a $1,409
14,361
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,574 $7,707 n/a $2,574
26,964
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,842 $3,169 n/a $1,842
18,464
kWh
08 2.7135: Install occupancy sensors $528 $675 n/a $528
7,034
kWh
TOTAL RECOMMENDED $16,244 $28,883 $16,244
171,454
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs