ITAC Assessment: AS0163
ITAC logo
ITAC Assessment: AS0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Felt for Tennis Balls
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 60,000
ft2
Annual Production 2,400
thousand feet
Production Hrs. Annual 8,112
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,605 2,800,703
kWh
Natural Gas $123,825 25,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,110 $9,153 $11,110
178,488
kWh
-
02 2.7135: Install occupancy sensors $1,499 $1,135 $1,499
29,894
kWh
-
03 2.4133: Use most efficient type of electric motors $16,808 $14,235 $16,808
251,465
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,608 - $6,608
97,597
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $595 $500 - $595
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $3,952 $7,500 - $3,952
-
MMBtu
07 2.2511: Insulate bare equipment $3,121 $3,655 $505
8,206
kWh
$2,616
-
MMBtu
TOTAL RECOMMENDED $43,693 $36,178 $36,530
565,650
kWh
$7,163
-
MMBtu
TOTAL IMPLEMENTED $7,203 $500 $6,608
97,597
kWh
$595
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs