ITAC Assessment: AS0160
ITAC logo
ITAC Assessment: AS0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Turbine Engine Components
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 45,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,883 3,719,519
kWh
Natural Gas $13,675 2,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $17,480 $12,523 $17,480
267,585
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,251 - $5,251
80,891
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $618 $1,210 $618
9,379
kWh
-
04 2.2437: Recover waste heat from equipment $3,078 $1,000 - $3,078
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,309 $1,200 $11,309
180,246
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,535 $18,701 $12,535
195,193
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $432 $656 $432
7,034
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $600 $389
6,448
kWh
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,722 $1,360 $2,346
34,584
kWh
$(-624.0)
-
MMBtu
10 2.7232: Replace existing hvac unit with high efficiency model $17,773 $54,725 $17,773
243,845
kWh
-
TOTAL RECOMMENDED $70,587 $91,975 $68,133
1,025,205
kWh
$2,454
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs