Assessment Year | 1995 |
---|---|
Principal Product | Commercial and Military/Aircraft and Rocketry Parts |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
80,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 6,344
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $195,131 | 2,543,669 |
kWh
|
$0.077 |
Natural Gas | $2,300 | 351 |
MMBtu
|
$6.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,172 | $6,162 | n/a |
$5,172
62,720
kWh
|
- |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,785 | - | n/a |
$1,785
19,637
kWh
|
- |
03 | 2.4314: Use synthetic lubricant | $2,539 | $300 | n/a |
$2,539
20,223
kWh
|
- |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $187 | $100 | n/a |
$187
2,638
kWh
|
- |
05 | 2.2437: Recover waste heat from equipment | $460 | $850 | n/a | - |
$460
-
MMBtu
|
06 | 2.7231: Use radiant heater for spot heating | $1,638 | $8,104 | n/a | - |
$1,638
-
MMBtu
|
07 | 2.7241: Install outside air damper / economizer on hvac unit | $4,656 | $7,000 | n/a |
$4,656
86,166
kWh
|
- |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $13,386 | $47,025 | n/a |
$13,386
173,212
kWh
|
- |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,847 | $20,429 | n/a |
$4,847
73,271
kWh
|
- |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $597 | $1,649 | n/a |
$597
9,086
kWh
|
- |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,937 | $16,594 | n/a |
$4,937
70,926
kWh
|
- |
12 | 2.7135: Install occupancy sensors | $560 | $750 | n/a |
$560
10,258
kWh
|
- |
TOTAL RECOMMENDED | $40,764 | $108,963 |
$38,666
528,137
kWh
|
$2,098
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs