| Assessment Year | 1995 |
|---|---|
| Principal Product | Diodes |
| NAICS |
n/a
|
| SIC | 3674: Semiconductors and Related Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 325 |
| Plant Area |
140,000
ft2
|
| Annual Production | 70,000,000
pieces
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $729,318 | 11,912,368 |
kWh
|
$0.061 |
| Natural Gas | $823 | 109 |
MMBtu
|
$7.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $129,472 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $84,403 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $9,046 | $8,327 |
$9,046
155,627
kWh
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,963 | - |
$3,963
69,168
kWh
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $8,667 | $25,900 |
$8,667
152,989
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $356 | $100 |
$356
6,155
kWh
|
|
| 05 | 2.3111: Heat water during off-peak periods and store for later use | $45,069 | $181,200 |
$45,069
-
kWh
|
|
| 06 | 2.4322: Use or replace with energy efficient substitutes | $12,763 | $39,855 |
$12,763
242,087
kWh
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,071 | $92,498 |
$39,071
682,005
kWh
|
|
| 08 | 2.7135: Install occupancy sensors | $4,666 | $8,700 |
$4,666
98,476
kWh
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,412 | $3,661 |
$5,412
99,941
kWh
|
|
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $459 | $600 |
$459
8,499
kWh
|
|
| TOTAL RECOMMENDED | $129,472 | $360,841 |
$129,472
1,514,947
kWh
|
||
| TOTAL IMPLEMENTED | $84,403 | $179,641 |
$84,403
1,514,947
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs