ITAC Assessment: AS0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 20,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 5,252
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,937 987,397
kWh
Natural Gas $5,158 854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $697 $300 $697
7,913
kWh
-
02 2.4133: Use most efficient type of electric motors $1,836 $1,706 $1,836
20,516
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $163 - $163
1,758
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $992 $2,275 $1,266
14,068
kWh
$(-274.0)
-
MMBtu
05 2.7232: Replace existing hvac unit with high efficiency model $2,091 $9,000 $2,091
23,447
kWh
-
06 2.7221: Lower temperature during the winter season and vice-versa $1,608 - $1,608
18,171
kWh
-
07 2.2614: Use cooling tower or economizer to replace chiller cooling $154 $750 $154
1,758
kWh
-
TOTAL RECOMMENDED $7,541 $14,031 $7,815
87,631
kWh
$(-274.0)
-
MMBtu
TOTAL IMPLEMENTED $2,305 $300 $2,305
26,084
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs