ITAC Assessment: AS0134
ITAC logo
ITAC Assessment: AS0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product luggage
NAICS
n/a
SIC 3161: Luggage
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 56,500
ft2
Annual Production 72,000
pieces
Production Hrs. Annual 6,890
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,743 1,530,481
kWh
Natural Gas $5,305 908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,042 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,244 $32,980 n/a $10,244
118,113
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,790 $17,252 n/a $10,790
124,560
kWh
03 2.4133: Use most efficient type of electric motors $5,127 $3,500 n/a $5,127
59,203
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $576 - n/a $576
6,741
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $671 $300 n/a $671
7,620
kWh
06 2.4314: Use synthetic lubricant $1,634 $1,301 n/a $1,634
5,569
kWh
TOTAL RECOMMENDED $29,042 $55,333 $29,042
321,806
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs