ITAC Assessment: AS0130
ITAC logo
ITAC Assessment: AS0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product metal powder coatings
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 51,855
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,088 715,709
kWh
Natural Gas $99,398 18,609
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,427 $16,440 $14,427
130,422
kWh
-
02 2.7135: Install occupancy sensors $2,028 $1,000 $2,028
18,464
kWh
-
03 2.4133: Use most efficient type of electric motors $6,494 $2,571 $6,494
58,910
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,335 - $1,335
12,016
kWh
-
05 2.4314: Use synthetic lubricant $1,066 $1,006 $1,066
7,034
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $567 $250 $567
5,275
kWh
-
07 2.2511: Insulate bare equipment $1,477 $748 - $1,477
-
MMBtu
TOTAL RECOMMENDED $27,394 $22,015 $25,917
232,121
kWh
$1,477
-
MMBtu
TOTAL IMPLEMENTED $7,061 $2,821 $7,061
64,185
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs