ITAC Assessment: AS0127
ITAC logo
ITAC Assessment: AS0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Vinyl & Plastic Products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 26,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,101 233,587
kWh
Natural Gas $2,096 306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $932 $2,000 - $932
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $806 - $806
7,327
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $272 $100 $272
2,345
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,233 $13,725 $5,233
46,893
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $491 - $491
4,396
kWh
-
06 2.7135: Install occupancy sensors $191 $300 $191
1,758
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $1,575 $750 $1,575
14,068
kWh
-
TOTAL RECOMMENDED $9,500 $16,875 $8,568
76,787
kWh
$932
-
MMBtu
TOTAL IMPLEMENTED $2,844 $1,150 $2,844
25,498
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs