Assessment Year | 1994 |
---|---|
Principal Product | Plastic Bags |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 79 |
Plant Area |
68,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,723 | 2,746,483 |
kWh
|
$0.079 |
Natural Gas | $5,168 | 801 |
MMBtu
|
$6.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,652 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,176 | $11,059 | n/a |
$8,176
103,165
kWh
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,339 | $5,515 | n/a |
$2,339
27,550
kWh
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $325 | $30 | n/a |
$325
4,103
kWh
|
04 | 2.4133: Use most efficient type of electric motors | $13,760 | $7,722 | n/a |
$13,760
173,505
kWh
|
05 | 2.4314: Use synthetic lubricant | $2,409 | $968 | n/a |
$2,409
15,533
kWh
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,527 | $350 | n/a |
$1,527
19,343
kWh
|
07 | 2.2511: Insulate bare equipment | $2,152 | $705 | n/a |
$2,152
27,257
kWh
|
08 | 2.2511: Insulate bare equipment | $795 | $420 | n/a |
$795
9,965
kWh
|
09 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,003 | $7,500 | n/a |
$2,003
25,205
kWh
|
10 | 2.8114: Change rate schedules or other changes in utility service | $18,166 | $25,250 | n/a |
$18,166
-
kWh
|
TOTAL RECOMMENDED | $51,652 | $59,519 |
$51,652
405,626
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs