ITAC Assessment: AM0348
ITAC logo
ITAC Assessment: AM0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Blow out preventors, drilling riser components
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 93
Plant Area 60,000
ft2
Annual Production 2,720
pieces
Production Hrs. Annual 5,470
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,735 2,270,516
kWh
Electricity Demand $22,246 7,296
kW-mo/yr
Electricity Fees $9,454 -
Natural Gas $43,552 6,830
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $23,000 $19,400 - $23,000
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $14,050 $14,046 - - $14,050 - -
03 2.8114: Change rate schedules or other changes in utility service $11,691 $2,000 - $(-26,886.0)
-
kW-mo/yr
$38,577 - -
04 2.2414: Use waste heat from hot flue gases to preheat $11,110 $10,500 - - - $11,110
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $6,860 - $6,860
196,073
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $655 $405 $60
1,758
kWh
$40
-
kW-mo/yr
- - $555
TOTAL RECOMMENDED $67,366 $46,351 $6,920
197,831
kWh
$(-3,846.0)
-
kW-mo/yr
$52,627 $11,110
-
MMBtu
$555
TOTAL IMPLEMENTED $20,910 $14,046 $6,860
196,073
kWh
- $14,050 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs