ITAC Assessment: AS0125
ITAC logo
ITAC Assessment: AS0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Baked Bread & Rolls
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 33,800,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,793 2,838,804
kWh
Natural Gas $90,853 20,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $6,814 $4,530 $6,814
88,804
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $207 $100 $207
2,638
kWh
-
03 2.4314: Use synthetic lubricant $2,011 $2,635 $2,011
15,826
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,498 $26,464 $12,498
162,954
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,452 $4,025 $4,452
41,032
kWh
-
06 2.7135: Install occupancy sensors $2,706 $825 $2,706
35,170
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $659 $1,000 - $659
-
MMBtu
08 2.7233: Use properly designed and sized hvac equipment $2,173 $3,200 $2,173
28,429
kWh
-
TOTAL RECOMMENDED $31,520 $42,779 $30,861
374,853
kWh
$659
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings