ITAC Assessment: AS0100
ITAC logo
ITAC Assessment: AS0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product LAWN CARE EQUIP. PARTS
NAICS
n/a
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 3,900,000
pieces
Production Hrs. Annual 6,448
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,432 1,517,292
kWh
Natural Gas $38,630 6,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $480 $400 $480
4,689
kWh
-
02 2.4133: Use most efficient type of electric motors $496 $366 $496
4,982
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,033 - $1,033
10,258
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $515 $380 $515
5,275
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,123 $2,470 $2,123
21,395
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $989 $628 $989
9,965
kWh
-
07 2.7135: Install occupancy sensors $637 $600 $637
6,448
kWh
-
08 2.7231: Use radiant heater for spot heating $2,175 $4,000 - $2,175
-
MMBtu
TOTAL RECOMMENDED $8,448 $8,844 $6,273
63,012
kWh
$2,175
-
MMBtu
TOTAL IMPLEMENTED $2,009 $766 $2,009
19,929
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs