Assessment Year | 1993 |
---|---|
Principal Product | MATTRESS BOX SPRINGS |
NAICS |
n/a
|
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 7,800,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,844 | 764,068 |
kWh
|
$0.072 |
Natural Gas | $10,605 | 2,163 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,776 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,978 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,214 | - |
$1,311
18,171
kWh
|
- | $(-97.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,684 | $6,300 |
$3,684
51,290
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $421 | $710 |
$421
5,862
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,008 | $250 |
$1,008
14,068
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $672 | $656 |
$672
9,379
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,979 | - |
$1,979
27,550
kWh
|
- | - | |
07 | 2.2443: Re-use or recycle hot or cold process exhaust air | $257 | $560 | - |
$257
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $2,541 | $2,131 | - |
$2,541
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $11,776 | $10,607 |
$9,075
126,320
kWh
|
$2,798
-
MMBtu
|
$(-97.0) | ||
TOTAL IMPLEMENTED | $8,978 | $7,916 |
$9,075
126,320
kWh
|
- | $(-97.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs