ITAC Assessment: AS0093
ITAC logo
ITAC Assessment: AS0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product MATTRESS BOX SPRINGS
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area
n/a
Annual Production 7,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,844 764,068
kWh
Natural Gas $10,605 2,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,214 - $1,311
18,171
kWh
- $(-97.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,684 $6,300 $3,684
51,290
kWh
- -
03 2.7135: Install occupancy sensors $421 $710 $421
5,862
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,008 $250 $1,008
14,068
kWh
- -
05 2.4133: Use most efficient type of electric motors $672 $656 $672
9,379
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,979 - $1,979
27,550
kWh
- -
07 2.2443: Re-use or recycle hot or cold process exhaust air $257 $560 - $257
-
MMBtu
-
08 2.2511: Insulate bare equipment $2,541 $2,131 - $2,541
-
MMBtu
-
TOTAL RECOMMENDED $11,776 $10,607 $9,075
126,320
kWh
$2,798
-
MMBtu
$(-97.0)
TOTAL IMPLEMENTED $8,978 $7,916 $9,075
126,320
kWh
- $(-97.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs