ITAC Assessment: AS0091
ITAC logo
ITAC Assessment: AS0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product WATER TREATMENT EQUIP.
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 24,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,496 880,129
kWh
Natural Gas $2,282 374
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $2,875 $3,800 $2,875
39,273
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $1,516 - $1,516
20,809
kWh
-
03 2.4133: Use most efficient type of electric motors $27 $141 $27
293
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $150 $110 $150
2,052
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $223 $500 $223
2,931
kWh
-
06 2.4314: Use synthetic lubricant $95 - $95
1,172
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,223 $2,074 $1,380
18,757
kWh
$(-157.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,767 $4,293 $2,767
37,808
kWh
-
09 2.7135: Install occupancy sensors $3,014 - $3,014
41,032
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $421 $340 $421
5,862
kWh
-
TOTAL RECOMMENDED $12,311 $11,258 $12,468
169,989
kWh
$(-157.0)
TOTAL IMPLEMENTED $1,693 $251 $1,693
23,154
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs