| Assessment Year | 1993 |
|---|---|
| Principal Product | WATER TREATMENT EQUIP. |
| NAICS |
n/a
|
| SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 24,000
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,496 | 880,129 |
kWh
|
$0.073 |
| Natural Gas | $2,282 | 374 |
MMBtu
|
$6.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,311 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,693 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,875 | $3,800 |
$2,875
39,273
kWh
|
- | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,516 | - |
$1,516
20,809
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $27 | $141 |
$27
293
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $150 | $110 |
$150
2,052
kWh
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $223 | $500 |
$223
2,931
kWh
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $95 | - |
$95
1,172
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,223 | $2,074 |
$1,380
18,757
kWh
|
$(-157.0) | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,767 | $4,293 |
$2,767
37,808
kWh
|
- | |
| 09 | 2.7135: Install occupancy sensors | $3,014 | - |
$3,014
41,032
kWh
|
- | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $421 | $340 |
$421
5,862
kWh
|
- | |
| TOTAL RECOMMENDED | $12,311 | $11,258 |
$12,468
169,989
kWh
|
$(-157.0) | ||
| TOTAL IMPLEMENTED | $1,693 | $251 |
$1,693
23,154
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||