Assessment Year | 1993 |
---|---|
Principal Product | WATER TREATMENT EQUIP. |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 24,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,496 | 880,129 |
kWh
|
$0.073 |
Natural Gas | $2,282 | 374 |
MMBtu
|
$6.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,311 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,693 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,875 | $3,800 |
$2,875
39,273
kWh
|
- | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,516 | - |
$1,516
20,809
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $27 | $141 |
$27
293
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $150 | $110 |
$150
2,052
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $223 | $500 |
$223
2,931
kWh
|
- | |
06 | 2.4314: Use synthetic lubricant | $95 | - |
$95
1,172
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,223 | $2,074 |
$1,380
18,757
kWh
|
$(-157.0) | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,767 | $4,293 |
$2,767
37,808
kWh
|
- | |
09 | 2.7135: Install occupancy sensors | $3,014 | - |
$3,014
41,032
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $421 | $340 |
$421
5,862
kWh
|
- | |
TOTAL RECOMMENDED | $12,311 | $11,258 |
$12,468
169,989
kWh
|
$(-157.0) | ||
TOTAL IMPLEMENTED | $1,693 | $251 |
$1,693
23,154
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs